Welcome to the CPW Lazor App Solver

Lazor Project for Software Carpentry Class


Welcome to the CPW Lazor App Solver

Here we will attempt to solve the toughest boards you dare to throw at us with our humble yet efficient code.

How do you use it?

If you’re having trouble solving a particular board, dont worry, just get it into a .bff file. The .bff file should contain:

1. Comments that help you understand the contents of the file
2. The position of blocks and empty movable positions in a grid form
3. Number and types of blocks where:

A - Reflect block 
B - Opaque block
C - Refract block
L - Laser coordinates (origin and direction) 
P - Hole/sink coordinates

Once you’ve made your .bff file use the “Lazor_Project_Final_Code” to solve it. Insert the file name in line 801. (For your reference open any board folder in the master branch and use the .bff file for that board as a template)

How does our method work?

The way the code solves a particular board is as such:

We designed a grid for a given board, with each block in the board being a middle point on the block in a grid.

x x x x x
x o x A x
x x x x x

These are 2 blocks of the grid portraying two blocks of the board (o and A).

The Block function in the class Grid will create a random permutation of the available blocks and movable spaces in the grid and give this permuation to the lazor_path function to solve it.
The axes are : horizontal direction is the x axis and vertical deriction is the y axis.
The lazor_path checks if for the the given placement of blocks all the lazors hit all the sinks/ holes or not. As soon as it comes across the right grid, the simulation stops and it prints out the correct grid which is the solution to the board.

Yeah we solved it!!

For you lazy bones out there:

For visual appeal we generated a GUI image (which will be saved in the same directory along with a txt file called solution_textfile.txt with the same information) for the solution where: dark grey blocks as - empty positions (o’s) white blocks as - reflect blocks (A’s) black blocks as - absorb blocks (B’s) cyan blocks as - refract blocks (C’s)

Your board should be solved in a maximum of 2 min. Bigger or more complicated boards take longer time. Have fun cheater! (no offense!)

What we did in these 3 weeks :

The toughest board so given -
alt test

The solution we present -
alt test

Master Branch has the final code and a folder “Trial Codes” where we tried different ways to reach the solution board. It also contains folders for each board containing the given and output files so generated from the code. GUI Branch has all the GUI trial codes.

The timeline is as follows alt test

If you are still confused then Contact :

Charan S. Pasupuleti : spasupu1@jh.edu , spasupu1
Prabhjot K. Luthra : pluthra2@.jh.edu , pluthra2
Wayne D. Monteiro : wmontei1@jh.edu , waynemonteiro97